Pre-built in our workshop. Perfected in your home.Call 071 524 5894
Bathroom renovations, Johannesburg

A new bathroom in 5 days.* One fixed price.

Pre-built plumbing, one installation team, from R 39 995 incl. VAT. Your price is fixed after a free measure.

*Five days is our target from the day we start on site. Hidden problems behind walls can add time, and we’ll tell you straight away if they do.

A finished Atlantic-style bathroom with blue tiles, terrazzo walls and black fittingsAtlantic · concept
  • 5 dayson site, from strip-out to handover
  • 1 containereverything for your bathroom, delivered at once
  • 1 teamfrom the first day to the handover
  • Freemeasure, with tile and finish samples
Why it’s different

The slow part happens before we arrive.

A normal renovation means weeks of builders, waiting for parts and a price that keeps moving. We do the slow part first: your plumbing is built and pressure-tested in our workshop, and every tile and fitting is packed into one container.

A crane lowers the 5dayBathroom container into a Johannesburg garden
Delivery day. Everything for your bathroom, in one container.
A pre-built plumbing frame with basin and toilet carriers, fitted before tiling
A pre-built frame, fitted before tiling.

Plumbing built by Bopha Pre-Fabricators. Fitted by Inter Africa Plumbing.

CLEAR PRICES

Know the price before anyone visits.

Every bathroom includes stripping out the old one, pre-built plumbing, tiling, painting and fitting your sanitaryware. Pay 60% to start and 40% at the end, or spread the full price over 12 to 24 months.

Want to choose every tile and tap? Design it item by item.

FIVE DAYS ON SITE

Your week, one day at a time.

  1. Strip-out

    The old bathroom comes out. Everything for the new one is already on site, packed in one container.

  2. The frame goes in

    Plumbing built and pressure-tested in our workshop is fitted to the wall.

  3. Tiling

    Walls and floor are tiled in the style you chose.

  4. Paint and fittings

    Paint goes on, then your vanity, toilet, taps and shower.

  5. Handover

    We test every fixture, walk you through it and sign it off together, then clean up and take the container away.

A typical job, shown day by day. Five days is our target from the day we start on site; hidden problems behind walls can add time, and we’ll tell you straight away if they do. See every step.

FIVE LOOKS

Pick a look. See its price.

See every style →

Style pictures are concepts. Your products and layout are confirmed at your free measure.

Questions

Questions people ask us.

How much does a bathroom renovation cost?

Our bathrooms start at R 39 995 for a small bathroom, R 55 900 for medium and R 79 900 for large, including VAT. Your finishes change the price, and you can see every item online. A free measure fixes the final price.

Can a bathroom really be done in five days?

Yes, because the slow work happens first. We build and pressure-test your plumbing in our workshop and pack everything into one container, so nothing is waiting on a supplier once we start. Five days is our target from the first day on site; hidden problems behind walls can add time.

How do I pay?

Two ways to pay. Project pricing: 60% to start your build and the remaining 40% at the end. Or a payment plan that spreads the full price over 12 to 24 months.

What happens at the free measure?

A sales technical engineer visits with tile and finish samples, measures your bathroom and confirms your fixed price. There’s no obligation.

No obligation · no login

Your new bathroom is three taps away.

See your price now and we’ll WhatsApp it to you, with a time for your free measure.

Get my price