Two to three weeks of planning. Five days in your home.
Here is every step, in order.

Choose your look
Choose your size, style and layout online and see your price in minutes.
Free measure with samples
Our sales technical engineer visits you with tile and finish samples, so you can finalise your selection and colours by feel. We measure free of charge and confirm your fixed price.
Approve your fixed price
You get one price for the bathroom you chose. Nothing is ordered until you approve it.
Choose how to pay
Pay 60% to start and 40% at the end, or pay your bathroom off over 12 months.
We build it in our workshop
Your plumbing frames are made to your measurements and pressure-tested, and every tile and fitting in your chosen finishes is checked and packed.
Delivery day
A 3 m × 3 m container arrives at your home with every part of your bathroom packed inside, ready for the team.
Five days on site
Once your old bathroom has been stripped out (quoted separately), our team fits the frame, then tiles, paints and fits your sanitaryware.
Handover, clean-up and collection
We test every fixture, walk you through your new bathroom and sign it off together, then clean up and take the container away.
Everything is ready before we arrive.
The five days on site are possible because the slow work happens first. Your plumbing frames are built and pressure-tested, and every tile, tin of paint, fitting and piece of drying equipment is checked and packed into a 3 m × 3 m container that comes straight to your home.
- Nothing is still on order once work starts.
- Sourcing and planning take two to three weeks, before anyone arrives.
- One delivery with every part inside, so no waiting on suppliers.
- One team on site from the first fitting to sign-off.
About the process.
Can a bathroom really be done in five days?
Yes, because the slow work happens first. We build and pressure-test your plumbing in our workshop and pack everything into one container, so nothing is waiting on a supplier once we start. Five days is our target once your old bathroom has been stripped out, which is quoted separately and done first; hidden problems behind walls can add time.
How long before work starts?
Planning, sourcing and building your plumbing take two to three weeks after you approve your price. Everything is packed and checked before we arrive, then the work on site takes five days.
What happens at the free measure?
A sales technical engineer visits with tile and finish samples, measures your bathroom and confirms your fixed price. There’s no obligation.
Can you move the toilet or shower?
Yes. Keeping fittings where they are is the quickest and most affordable option. Moving them adds to the price, and the designer shows you how much before you book.
Who does the work?
Your plumbing frames are built by Bopha Pre-Fabricators and your bathroom is installed by Inter Africa Plumbing, one team from start to finish.
Are the style pictures real bathrooms?
They are concepts that show each style. Your products and layout are confirmed with samples at your free measure.
*Five days is our target once your old bathroom has been stripped out, which is quoted separately and done first. Changes you ask for, or hidden problems behind walls, can add time. The free measure confirms the scope and your fixed price.